| Highgate Childrens Centre |
 |
| London, N6 |
Refurbishment and extension of a children’s centre. This contract related to the existing Highgate Children’s Centre at Highgate Primary School. The work entailed minor demolition work and complete stripping out of the existing building. We completely refurbished and fitted out the structure and built a completely new extension.
|
| Norwood School |
 |
| London, SE19 |
New build 2-storey classroom block - steel frame on piles with in-situ concrete floors and single layer felt roof.
Click Here for More Information |
| Graveney Secondary School |
 |
| London, SW17 |
Demolition of existing single storey brick structure, diversion of mains, groundworks and foundations at an occupied school.
Click Here for More Information |
| Kimber Road Adventure Playground |
 |
| London, SW18 |
Demolition of the existing playbuilding and removal of storage containers. Once completed, the construction of a new playbuilding including all services and associated hard and soft landscaping.
|
| East Sheen Primary School |
 |
| London, SW14 |
Construction of a single storey detached unit to form two classrooms with WC block.
|
| Gainsborough School Children’s Centre |
 |
| London, E9 |
Complete internal and external refurbishment of school building including demolition and alterations, new timber vertical sliding sash windows disabled persons’ WC, groundworks, brick and pointing repairs, complete new mechanical and electrical installations, roof repairs, internal decoration and external paving/play area works.
|
Morningside Children’s Centre
|
 |
| London, E9 |
Construction of a new timber framed children's centre. Traditional build with structural steel frame and masonry infill with a pre-form metal roof, new heating and electrical system, full solar panel system installed above plant room and fully fitted out ready for occupation, hard and soft landscaping.
|
| Springfield Community Primary School |
 |
| London, N16 |
Refurbishment of existing classrooms, ancillary spaces and extension to the existing east wing.
|
7 Children’s Centres |
 |
| Lambeth |
Diamond build created the new build extensions to the children’s centre site, with green living roofs and local landscaping, to 7 schools across the London Borough of Lambeth. The works include foundations, drainage, new/relocation of gas, electric and water services, plumbing, heating works, electrics, ventilation, plastering, screeding, carpentry & bespoke joinery, carpets & floor tiling, ceramic tiling, painting & decorating of the new buildings.
|
| St Ann’s Special Needs School |
 |
| London, W7 |
The contract required the construction of a new classroom block and the refurbishment of the existing Special Needs school building whilst the building was occupied. Construction works also included the building of a new hydrotherapy pool.
The major challenges faced on this contract were the high level, intensive, building users’ liaison required, and the ability to ensure all works were undertaken with the minimum amount of disruption to the children and their teachers alike.
Click Here for More Information
|
| Dulwich College Priority Works |
 |
| London |
Building repairs excluding M&E to various buildings on the Dulwich College Estate. Principal contractor / H&S supervision of Mechanical and Electrically subcontractor.
|
| Raynham Primary School |
 |
| London, N18 |
Diamond Build has a long working relationship with Raynham Primary School, for both major and minor works projects.
Construction works we have undertaken have included the refurbishment of the toilet facilities, the refurbishment of the Diamond Hall and kitchen, installation of a new suspended ceiling, electrics and redecoration of the Early Learning Hall, the installation of uPVC windows, overhaul wooden windows, external redecoration, and leadwork repairs to Cupola.
|
| Randal Cremer Primary School |
 |
| London, E2 |
This contract comprised a new build extension and refurbishment to the existing 6 storey school building.
The extension provided additional classrooms, offices and a new entrance foyer. |
| Sure Start Nursery |
 |
| London, N17 |
The contract comprised the internal and external refurbishment of the existing offices, and the construction of a new extension to the nursery.
|
| Sellincourt Primary School |
 |
| London, SW17 |
Sellincourt Primary School works involved replacing existing single glazed timber windows with double glazed timber windows including associated external repair works.
|
| Eardley Primary School |
 |
| London, SW16 |
Eardley School works involved the removal of existing single glazed timber windows with double glazed timber windows including associated external repair works.
|
| Bowes Primary School
|
 |
| London |
The works at Bowes Primary school consisted of external repairs works and refurbishment to the external structure of the building along with the overhauling of timber windows.
|
|
|
|