
Renewal of flat roof coverings and insulation, water tank, internal pipework, handrails, etc. The metal and glass clad structure to the tank room at roof level was removed and renewed with a timber and uPVC housing.
| Form of Contract | JCT MW 2005 |
|---|---|
| Contract Value | £0.305m |
| Contract Period | 12 weeks |
| Client | London Borough of Enfield |